Bernstein Management Corporation’s 4115 Davis – part of Park Crest Apartments – is set to produce sun power with its new solar installation. The blue panels on the roof will offset almost 60,000 kWh annually, which will prevent the emission of almost 45 metric tons of carbon – the equivalent of taking nearly ten cars off the road for one year. The DC Sustainable Energy Utility (DCSEU), a long-time partner of BMC, offered technical guidance throughout the procurement and installation process.